10 times contractors needed something stronger than traditional ducting

MULTIduct projects in pictures

What does a defence facility, a motorway bridge, a city centre tram network, and a rail maintenance depot have in common?

They may serve different industries with different engineering requirements, but they all approached Cubis Systems with a similar challenge:

How do you protect critical underground cables when traditional ducting isn't adequate?

Sometimes, the challenge presented is limited excavation depth. Sometimes it’s congested underground services. Sometimes it’s time, cost, resource, or physical space challenges.

In each case, the client needed a cable protection system that offered more strength, more flexibility, or more efficiency than traditional approaches.

Here's a look at 10 instances where MULTIduct helped solve those challenges – told through project pictures.

1. Remote infrastructure for a Dutch defence facility

1. Remote infrastructure for a Dutch defence facility

📍Location: Netherlands

🪛 Solution: MULTIduct, STAKKAbox™ ULTIMA Connect & composite covers

📌 Highlight: Provided a lightweight, easy-to-transport system for difficult sand-based conditions on a remote MoD facility - reducing the risk of movement, damage, and cable route confusion associated with traditional ducting

2. Faster under-road crossings for traffic infrastructure

2. Faster under-road crossings for traffic infrastructure

📍 Location: Worcester, UK

🪛 Solution: MULTIduct, STAKKAbox™ Modula & composite covers

📌 Highlight: Specified by Worcester City Council to reduce excavation, spoil removal, backfill requirements, and installation time for an under-road crossing

3. Increasing duct capacity in a confined French rail depot

3. Increasing duct capacity in a confined French rail depot

📍Location: Massy-Palaiseau, France

🪛 Solution: 4-way and 6-way MULTIduct

📌 Highlight: Installed in multi-bank formation to deliver 20 ducts within a congested space of just over 500mm wide by 650mm high - capacity that traditional ducting systems simply could not have achieved

4. Shallow ducting for a busy Newcastle bus route

4. Shallow ducting for a busy Newcastle bus route

📍Location: Barras Bridge, Newcastle, UK

🪛 Solution: 4-way MULTIduct

📌 Highlight: Installed at 300mm depth to avoid the risk of damaging existing underground services on a congested city bus route - while still creating a robust underground duct network

5. Managed and organised utility lines for water infrastructure

5. Managed and organised utility lines for water infrastructure

📍Location: Hampshire, UK

🪛 Solution: 4-way and 6-way MULTIduct

📌 Highlight: Created a flexible yet structural duct run that optimised available space, integrated seamlessly with our composite chambers, and enabled quick, easy installation through its unique push-fit system

6. Power cable protection for a new Polish highway

6. Power cable protection for a new Polish highway

📍Location: Lubień, Poland

🪛 Solution: 9-way MULTIduct and accessories

📌 Highlight: Over 2,300 MULTIduct units used to distribute high and low voltage cables from a sub power station within a small excavation, without the traditional cable pulling and twisting issues

7. Supporting Grand Paris light rail expansion

7. Supporting Grand Paris light rail expansion

📍Location: Paris, France

🪛 Solution: MULTIduct, STAKKAbox™ access chambers & supporting frames and covers

📌 Highlight: Approached during the design and specification stages of a major Grand Paris transport redevelopment to help create a lightweight, adaptable, and efficient below-ground infrastructure solution for one of Europe’s most significant transport programmes

8. Bespoke bridge crossing for a Scottish motorway network

8. Bespoke bridge crossing for a Scottish motorway network

📍Location: Scotland, UK

🪛 Solution: MULTIduct, STAKKAbox™ ULTIMA & concrete infill covers

📌 Highlight: Designed bespoke 45° MULTIduct bends to transfer cables across a 40m bridge and back into the wider motorway communications network (built with STAKKAbox™ access chambers)

9. Rail renewals at Northern Ireland’s Dark Arches

9. Rail renewals at Northern Ireland’s Dark Arches

📍Location: Whiteabbey, Northern Ireland

🪛 Solution: MULTIduct, PROtrough, STAKKAbox™ ULTIMA Connect & composite covers

📌Highlight: Over 120m of MULTIduct installed during a 2hr night shift using only 7 workers and 2 machines - highlighting how quickly our products can be installed and how non-labour-intensive the installation is

10. Future-proofing Birmingham’s city centre metro network

10. Future-proofing Birmingham’s city centre metro network

📍Location: Birmingham, UK

🪛 Solution: MULTIduct, various STAKKAbox™ chambers & recessed covers

📌 Highlight: Supplied over 1km of MULTIduct and 100+ STAKKAbox™ chambers as part of the city’s wider metro redevelopment – helping to contain multiple utilities within a single ducting system in compact city conditions

Talk to the team about MULTIduct

These projects show MULTIduct’s inherent adaptability. From bus routes to bridge crossings, rail networks to defence facilities, motorway schemes to multiple more, MULTIduct helps contractors create cable routes with less excavation, less disruption, and more confidence in long-term protection.

Need a cable protection system that works around the practical realities of site? Get in touch below:

Let us help direct your enquiry.

Please select from the options below to locate the appropriate representative to help with your enquiry.

Your Details
Would you like to receive information regarding products, services, news and promotions from Cubis? We won't share your details with other companies. For more information about how we store your data view our privacy policy.


Sector Contact

Seamus Kearns

Sector Manager - Energy & Major Projects

Tel: +44 (0)7500 121 479

Sector Contact

Andy Hobbis

Head of Sales - UK & IRE

Tel: +44 (0)7815 558 337

Sector Contact

Craig Brown

National Telecoms Manager

Tel: +44 (0)7385 029 479

Sector Contact

Andy Hobbis

Head of Sales - UK & IRE

Tel: +44 (0)7815 558 337

Regional Contact

Alan Long

Chief Commercial Officer

Tel: 00353 (0)86 7707 425

Business Development Contact

James Gallagher

Head of Business Development - UK & Ireland

Tel: +44 (0)7392 135 931

Regional Site Available

Please navigate to Cubis' regional website offering for all local enquiries.

How to Get Started

Contact Us →

Sign up for exclusive news, events and announcements

Subscribe

For more information see our Privacy Policy.