Gas Infrastructure Access Chamber Overbuild
Case Study Details
Client
Wales and West Utilities
Product
STAKKAbox™ ULTIMA Connect, AX-S™ Composite Cover
Sector
Energy
Case Study
Wales and West Utilities recently specified and installed Cubis ULTIMA Connect access chambers and cover solutions to replace existing brick built structures around high pressure gas valves.
Rapid Overbuild Around Existing Gas Infrastructure
Cubis supplied modular, scalable, flat pack chambers in various sizes, bespoke to each site, that enabled overbuilding of the new chambers around the large high-pressure gas valves without the need for shuttering or specialist concrete work. The flat packed chamber solutions provided rapid installation times with the contractor being able to assemble all chambers on site in less than one day. Cubis also supplied lightweight, easy to lift AX-S™ C250 composite frames & covers to complement each chamber.
To optimise installation speed and efficiency Cubis worked with the asset owner from initial design phase to final installation to provide bespoke engineering calculations for each site, to support backfill recommendations and to provide relevant drawings, BIM files and installation guides.
The Cubis team helped from design phase to final installation advice, to ensure another successful Energy project. To find out how the Cubis team can help your next project please get in touch.