Design smarter
The benefits of engaging with Cubis Systems at the design stage
When most people think of Cubis Systems, they think of our industry-leading access chambers, covers, and cable protection solutions. But we’re more than a manufacturer. Cubis is also a strategic project partner, and one that can deliver major time, cost, and carbon savings before a shovel hits the ground.
Here's a closer look at why engaging Cubis at the design stage can have a transformative impact on your project.
A case in point: £235,000 saved before build
To illustrate the value of early collaboration, consider a recent project where our team was brought in during the initial design phase. Using our in-house expertise and advanced BIM tools, we reworked the specification to optimise the application of Cubis products.
The result saw the client save over £235,000 before a single product was delivered. (As well as 282 tonnes of CO2 savings, and a 30% reduction in the number of chambers required.)
- Watch the video for the proof in action
- Read the full case study
Engaging Cubis early unlocks the full potential of our end-to-end approach. Here’s how it works:

1. BIM-powered confidence
Our bespoke BIM configurator enables clients to quickly generate detailed, accurate product models tailored to their project needs.
Whether you’re working on a national utility scheme or a complex rail junction, our digital tools allow you to:
- Visualise the final system in-situ
- Identify spatial conflicts or installation issues early
- Automate clash detection and streamline coordination
- Export directly into Revit or IFC formats for seamless integration

2. Specialist specification support
We employ a team of dedicated specification engineers who can review your drawings, assess environmental and loading requirements, and advise on the most effective solution. This technical support is backed by decades of sector knowledge, covering rail, telecoms, water, energy, highways and more.
Our engineers work collaboratively with your teams to:
- Streamline your chamber and cable protection layout
- Eliminate over-specification
- Reduce material volume
- Improve installation speed and access

3. Time, cost and carbon efficiencies
By optimising specifications and eliminating overengineering, we deliver tangible returns across three key areas:
- Time: Simpler installations, faster approvals, and reduced rework
- Cost: Optimised materials, fewer SKUs, and logistical efficiencies
- Carbon: Less concrete, fewer vehicle movements, lower embodied emissions
These efficiencies all add up - especially at scale.
What makes Cubis different?
While many manufacturers simply respond to specifications, Cubis takes a proactive role in helping shape them. By integrating digital tools, engineering expertise, and modular product innovation, we’re uniquely positioned to make infrastructure smarter. All before a single product leaves our factory.
In short: we can help you design better, not just build better.