Features & Benefits
Fast & Easy to Install
STAKKAbox™ chambers are significantly faster to install than conventional alternatives, with complete installations typically taking less than one hour. This results in reduced costs for the installer. No specialist equipment or plant is required in order to install the chamber and there is no need for specialist box builders
Sectional & Twin Wall Design
Chambers are built to required depth by adding 150mm sections. Due to the twinwall design, individual sections are light meaning they can be manually lifted. Each access chamber possesses vertical and horizontal ribs, resulting in a product that is strong vertically and on the sidewall. STAKKAbox™ JMF does not require specialist backfills, reducing installation costs.
Smooth Outer Walls with Lip to ‘Key In’
Gaps in the outer wall will negatively impact the effectiveness of compaction around the chamber. STAKKAbox™ chambers have smooth outer walls and an outer lip which keys into the backfill.
Flexible During Installation
Chambers can be adapted to suit on-site conditions with standard tools to overbuild over existing networks, Introduce duct entries for cable entry and for top-section fine adjustment.
Drop-in Furniture & Steps
Cable management and steps are fitted by dropping the accessories into pre-formed pockets. These allow accessories to be retrofitted after installation without mechanical fixing.
Meets Openreach Quality Requirements
Openreach checks all chambers against 13 step Quality Checklist for its brick, concrete and joint boxes. When using STAKKAbox™ JMF, this checklist is reduced to 8 checks.
‘NEW’ Ring Section Design
Pioneering chamber design that incorporates a custom textured tread pattern to increase mortar grip between the frame and chamber section, reducing lateral movement. Recessed locator grout bars provide a positive frame location, reducing frame movement.
All Weather Construction
Unlike with brick and concrete built chambers where freezing temperatures and heavy rain can stop work the JMF can be installed in all types of weather.
How It Works
Lightweight 150mm deep sections are stacked on top of a concrete or Type 1 base to build the chamber to the desired depth. There is no requirement for lifting plant or skilled box builders when building chambers.
Where required, rings can be cut to bridge over or around existing networks or obstacles.
'NEW' JMF vs Quad
The new STAKKAbox™ JMF has been design and developed to provide an enhanced all round telecoms network access chamber system compared with the Quad box.
Its design has been specifically tailored to meet the requirements of installations teams installing the system within a wider range of environments.
For further information visit our FAQ Section.

Materials
HDPE
STAKKAbox™ JMF is manufactured from High Density Polyethylene (HDPE) that possesses excellent strength to weight properties.

Available Sizes
STAKKAbox™ JMF is a modular access chamber, available in three sizes; 102, 104 and 106.
All chambers are available with B125 access covers and Cubis' range of chamber accessories.
Download our product size guide for chambers in order to gain more information on available sizes.

Load Rating
STAKKAbox™ JMF is the ideal solution for installations in areas rated B125 under BS: EN124: 1994.

Options & Accessories
STAKKAbox™ JMF can be supplied with the following accessories:

Drop In Furniture
Using Cubis access chamber systems accessories can help save even more time. Our chamber options & accessories range allows installers to simply drop in, connect up tubes or ducts, backfill and walk away.

AX-S™ Cover Options
The Cubis AX-S™ range of access covers provide customers with a complete underground network access system as they are designed and manufactured from a range of materials to complement our chamber ranges.

Secondary Security Covers
Developed to provide enhanced network security protection from vandals and criminals.
The system has been independently tested to Category C of Loss Prevention Board Standard 1175 and has resisted prolonged attack using heavy hand tools for a period in excess twenty minutes. The system has also been successfully fire tested.