Skip To Content
Call:
Get a Quote

Case Studies

rail infrastructure upgrade in Mooi, Haarlem, Amsterdam 1 MULTIduct™ - A key feature in Rail Infrastructure Upgrade in Haarlem, Amsterdam

Cubis systems supplied its access chamber and cable protection systems for the use in a rail infrastructure upgrade project in Mooi, Haarlem Amsterdam

IMG 0572.JPG Commonwealth Building Development – STAKKAbox™ ULTIMA Connect

The new Commonwealth Building Development saw the introduction of the Cubis’ STAKKAbox™ ULTIMA Connect™ chamber system

Case Study Thumbnail - Templeborough Templeborough Biomass Power Plant

Cubis where approached to provide specialist chamber access and cover systems for the distribution of utility services at the Biomass power plant

IMG 1059.JPG Dee Valley Water: Llywn Onn Reservoir and Pumping station

Cubis Systems supplied high-security access covers for Llwyn Onn, Dee Valley Waters’ largest water treatment works.

Project Nemo Link (237).JPG The Nemo Link®: STAKKAbox™ ULTIMA Connect Install

A truly international collaboration in the construction of an electrical interconnector between the UK and Belgium’s electricity grids.

SAM 4922 2 Queensferry Crossing bridge: RapidSTACK chamber Installation

The Queensferry Crossing bridge is the biggest infrastructure project in Scotland for a generation and is the longest three-tower, cable-stayed bridge

1 Treasury Gardens, Melbourne: ULTIMA Connect™ Training Workshop

Cubis provided an installation training workshop for the STAKKAbox™ ULTIMA Connect access pit system in Melbourne's Treasury Gardens.

QR8 Queensland Rail: Corinda and Roma Street Station Signal Upgrade

Queensland Rail (QR) Corinda to Roma Street Station Signal Upgrade Project featuring STAKKAbox™ ULTIMA Connect.

20170208 115211 Morbecque, France: Water Maintenance Chamber Upgrade

Morbecque, situated in the North-East of France has been subject to the installation of a large, bespoke access chamber and cover solution.

ULTIMA Connect - Careys - Canary Warf (6) 2 Canary Wharf: ULTIMA Connect Install

STAKKAbox™ ULTIMA Connect chamber offering the perfect solution to site access issues at Heron Quays Road, Bank Street, Lonon.

fortress install jpeg STAKKAbox™ Fortress Trial: NSW, Australia

Cubis Systems recently trialed the STAKKAbox™ Fortress and its application capabilities to Australian rail networks.

IMG 4722.JPG Water Meter Chamber Installation: Parc du Mercantour, France

Roubion; a remote village situated high up in Alpes Maritimes in France has been subject to an exciting water chamber installation in which an oversiz