UK
Get In Touch

FLEXI-Pit provides on-site adjustability for drainage catch pits around the Arley tunnel cutting slopes

Case Study Details

Client

Murphy's

Location

Arley, UK

Product

STAKKAbox™ ULTIMA, FLEXI-PIT, AX-S™ Composite Access Cover,

Sector

Rail

Case Study

Cubis supplied its Network Rail approved track-side drainage inspection chamber system FLEXI-Pit to the Arley Tunnel, Drainage and earthworks project in conjunction with Murphy’s.

The FLEXI-Pit drainage system has been designed and developed to offer easily adjustable duct positions for varying pipe invert levels onsite and is created from Cubis’ STAKKAbox™ ULTIMA access chamber system. The ULTIMA provides a modular, scalable solution available in a variety of sizes that are easily adaptable, lightweight, fast and easy to install. Seamless integration with Cubis’ chamber accessories and AX-S™ composite access covers provided the client with a complete underground drainage system solution.

Sign up for exclusive news, events and announcements

Subscribe

For more information see our Privacy Policy.