FLEXI-Pit provides on-site adjustability for drainage catch pits around the Arley tunnel cutting slopes

 

Cubis supplied its Network Rail approved track-side drainage inspection chamber system FLEXI-Pit to the Arley Tunnel, Drainage and earthworks project in conjunction with Murphy’s.

The FLEXI Pit drainage system has been designed and developed to offer easily adjustable duct positions for varying pipe invert levels onsite and is created from Cubis’ STAKKAbox™ ULTIMA access chamber system. The ULTIMA provides a modular, scalable solution available in a variety of sizes that are easily adaptable, lightweight, fast and easy to install. Seamless integration with Cubis’ chamber accessories and AX-S™ composite access covers provided the client with a complete underground drainage system solution.