Skip To Content
Call:
Get a Quote

Case Studies

182 - Balfour Beatty - Careys - ULTIMA Connect - UK - Power Distribution (8).JPG London Olympic Stadium Redevelopment: ULTIMA Connect

The installation of ULTIMA Connect System chambers for large high-voltage power cables in line with construction required for the 2012 Olympic Games.

091 - Worcester CC - MULTIduct Crossing - UK - 013 (1).JPG Worchester City Council Under Road Crossing: MULTIduct™

Worcester City Council under-road crossing installation using MULTIduct™ cable trough, MODULA chamber and AX-S™ Composite cover.

P1020359.JPG Training Day: Conductive Concrete Retrospective Install, Openreach

A retrospective installation demo of Cubis SAN-EARTH Conductive Concrete as part of BT's Openreach NGA (Next Generation Access) project.

ULTIMA Connect (Install) London Olympic Site Redevelopment: ULTIMA Connect

The installation of ULTIMA Connect System chambers for HV and LV cables in the redvelopment of the Here East, London Olympic Site.